<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Surplus Tube Fittings</title>
	<atom:link href="http://surplustubefittings.com/?feed=rss2" rel="self" type="application/rss+xml" />
	<link>http://surplustubefittings.com</link>
	<description></description>
	<lastBuildDate>Thu, 21 Oct 2010 16:07:28 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.0.1</generator>
		<item>
		<title>Swagelok Needle Valves Isolate and Vent System Media</title>
		<link>http://surplustubefittings.com/?p=140</link>
		<comments>http://surplustubefittings.com/?p=140#comments</comments>
		<pubDate>Thu, 21 Oct 2010 16:07:28 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Swagelok Valves]]></category>
		<category><![CDATA[information]]></category>
		<category><![CDATA[main]]></category>
		<category><![CDATA[needle valves]]></category>
		<category><![CDATA[swagelok]]></category>

		<guid isPermaLink="false">http://swageloktubefittings.com/?p=140</guid>
		<description><![CDATA[Swagelok has extended its product portfolio with the GU series needle valves for use in general utility service applications. The new GU series needle valves isolate and vent system media in instrument air, nitrogen header, lube oil, and other general &#8230; <a href="http://surplustubefittings.com/?p=140">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<div>
<div>
<p>Swagelok has extended its product portfolio with the GU series needle valves for use in general utility service applications.</p>
<p>The new GU series needle valves isolate and vent system  media in instrument air, nitrogen header, lube oil, and other general  utility applications, mainly in the oil and gas, chemical and  petrochemical markets.</p>
<p>Offered in stainless (for salt water usage)  and carbon steel, the GU series valve can be ordered in straight and  angle patterns with a choice of end connections in sizes from 0.25 to  1in (6 to 25mm).</p>
<p>The valve features operating pressures up to 413bar at 93C.</p>
<p>A sour gas service model is also available.</p>
<p>A two-piece knuckle joint drives the hardened stem tip to create a leak-tight seal.</p>
<p>The nonrotating stem design minimises seal wear, protects the seat from galling, and helps promote long service life.</p>
<p>Located above the valve packing, both the  knuckle joint and the strong, cold-rolled stem threads are isolated from  system media and protected from dust and dirt by a stainless steel  shroud.<a href="http://www.engineeringtalk.com/news/swa/swa117.html#ixzz130fruGXM"></a></p>
</div>
</div>
]]></content:encoded>
			<wfw:commentRss>http://surplustubefittings.com/?feed=rss2&amp;p=140</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
		<item>
		<title>Swagelok Bundled Tubing Simplifies Process Installation</title>
		<link>http://surplustubefittings.com/?p=126</link>
		<comments>http://surplustubefittings.com/?p=126#comments</comments>
		<pubDate>Thu, 21 Oct 2010 15:32:01 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Swagelok Tubing]]></category>
		<category><![CDATA[bundled]]></category>
		<category><![CDATA[stainless steel]]></category>
		<category><![CDATA[swagelok]]></category>
		<category><![CDATA[tubing]]></category>

		<guid isPermaLink="false">http://swageloktubefittings.com/?p=126</guid>
		<description><![CDATA[Swagelok Company has released new electric and steam traced pre-insulated bundled tubing to expand its analytical and process instrumentation product line. Swagelok&#8217;s traced bundled tubing is a predictable, repeatable, low-cost and easily maintained solution, which can be installed more quickly &#8230; <a href="http://surplustubefittings.com/?p=126">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p>Swagelok Company has released new electric and steam traced pre-insulated bundled tubing to expand its analytical and process instrumentation product line.</p>
<p>Swagelok&#8217;s traced bundled tubing is a predictable, repeatable, low-cost and easily maintained solution, which can be installed more quickly and can deliver more consistent thermal performance than field traced and insulated systems.</p>
<p>The bundled tubing is used in a variety of instrumentation applications that require process fluid freeze protection, temperature maintenance, viscosity control and energy conservation, such as impulse, process and sampling lines.</p>
<p>An additional benefit of Swagelok&#8217;s traced bundled tubing is that the individual tubes are installed parallel to each other, as apposed to cabled or twisted, which helps keep the tubing round, so fittings are easier to install and gives a tighter bend radius.</p>
<p>A variety of configurations with multiple process tubes and either electric or steam tracers are available.</p>
<p>The Swagelok tubing bundle is insulated with nonwicking, fibrous glass insulation and covered with a tough PVC or urethane jacket.</p>
<p>Swagelok electric traced bundled tubing features a self-regulating electric tracer that lowers heat output as the bundle warms.</p>
<p>It is typically used to maintain process temperatures up to 121C, without the need for dedicated temperature controllers.</p>
<p>Swagelok light steam traced bundled tubing provides freeze protection and maintains process temperatures between 10 and 93C.</p>
<p>The process tubes are separated from the tracer tubes by a layer of insulation that lowers the heat transfer rate and provides a more constant temperature over longer lengths of tubing.</p>
<p>In Swagelok heavy steam traced bundled tubing, the process tube is in direct contact with the tracer to provide process temperature maintenance from 93 to 204C.</p>
]]></content:encoded>
			<wfw:commentRss>http://surplustubefittings.com/?feed=rss2&amp;p=126</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
		<item>
		<title>Swagelok Ball valves meet natural gas regulations</title>
		<link>http://surplustubefittings.com/?p=123</link>
		<comments>http://surplustubefittings.com/?p=123#comments</comments>
		<pubDate>Thu, 21 Oct 2010 15:25:16 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Swagelok Valves]]></category>
		<category><![CDATA[ball valves]]></category>
		<category><![CDATA[main]]></category>
		<category><![CDATA[regulations]]></category>
		<category><![CDATA[swagelok]]></category>

		<guid isPermaLink="false">http://swageloktubefittings.com/?p=123</guid>
		<description><![CDATA[Swagelok Company has developed a new range of high-pressure, high-flow alternative fuel service ball valves. With working pressures up to 413bar at 121C and flow coefficients (Cv) ranging from 4.0 to 13.8, the AFS ball valve is currently the highest &#8230; <a href="http://surplustubefittings.com/?p=123">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p>Swagelok Company has developed a new range of high-pressure, high-flow alternative fuel service ball valves.</p>
<p>With working pressures up to 413bar at 121C and flow coefficients (Cv) ranging from 4.0 to 13.8, the AFS ball valve is currently the highest pressure valve on the market that meets the demands of many hydrogen and compressed natural gas applications.</p>
<p>The new two-way ball valve is also the latest Swagelok product with ECE R110 approval for use in natural gas vehicles, including buses, lorries, and cars.</p>
<p>The valve holds Class 0 approval as a higher cycle manual valve for service pressures up to 250bar at temperatures up to 120C.</p>
<p>The high operating temperatures allow the valve, for example, to be placed closer to compressors and engines permitting a wider range of applications.</p>
<p>Additional features include an ultra low-temperature fluorocarbon O-ring material which provides highly reliable sealing across the full temperature range of the valve (-40 to +121C); a robust, spring-loaded, patent-pending seat design which does not require packing adjustment after the valve is installed; and fractional and metric Swagelok tube fitting end connections providing gaugeable installation and consistent, leak-tight connections.</p>
<p>ISO and NPT end connections are also available, along with a heavy-duty quarter-turn directional handle, a Swagelok rack and pinion pneumatic actuator or an ISO5211-compliant rack and pinion pneumatic actuator.</p>
<p>The valve has also received ANSI/NGV 3.1 service valve certification to 248bar and ANSI/NGV 4.6 Class B certification to 310bar.</p>
<p>Swagelok Company has had products that meet ECE R110 approval for about two years and is the first company to provide comprehensive ECE R110 reference materials and documents.</p>
<p>&#8220;Swagelok has set out to offer a complete package so that end-users can reduce delays in documentation time and move quickly from the design phase to the marketplace&#8221;, said Pete Ehlers, Alternative Fuel Market Manager, Swagelok Company.</p>
<p>Approved components can be used across all countries that recognise or require the ECE R110 standard.</p>
]]></content:encoded>
			<wfw:commentRss>http://surplustubefittings.com/?feed=rss2&amp;p=123</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Swagelok Tubes and Fittings Handle Medium-Pressure Duties</title>
		<link>http://surplustubefittings.com/?p=121</link>
		<comments>http://surplustubefittings.com/?p=121#comments</comments>
		<pubDate>Wed, 20 Oct 2010 22:56:58 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Swagelok Tube Fittings]]></category>
		<category><![CDATA[bulkhead fittings]]></category>
		<category><![CDATA[crosses]]></category>
		<category><![CDATA[information]]></category>
		<category><![CDATA[main]]></category>
		<category><![CDATA[pressure]]></category>
		<category><![CDATA[swagelok]]></category>
		<category><![CDATA[tees]]></category>
		<category><![CDATA[Tube Fittings]]></category>
		<category><![CDATA[union]]></category>

		<guid isPermaLink="false">http://swageloktubefittings.com/?p=121</guid>
		<description><![CDATA[Medium-pressure products satisfy higher working pressure requirements in the alternative fuels and oil and gas industries. Swagelok now offers a line of medium-pressure products &#8211; gaugeable tube and adapter fittings, as well as seamless tubing &#8211; to satisfy higher working &#8230; <a href="http://surplustubefittings.com/?p=121">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p>Medium-pressure products satisfy higher working pressure requirements in the alternative fuels and oil and gas industries.</p>
<p>Swagelok now offers a line of medium-pressure products &#8211; gaugeable tube and adapter fittings, as well as seamless tubing &#8211; to satisfy higher working pressure requirements in the alternative fuels and oil and gas industries.</p>
<p>Swagelok medium-pressure gaugeable tube fittings and adapter fittings provide a leak-tight gas seal and vibration resistance in applications up to 1034bar.</p>
<p>Available in 0.25, 0.375 and 0.5in sizes, the all-316 stainless steel fittings come in a diverse range of fitting styles, including elbows, unions, bulkhead unions, reducing unions, tees, crosses, caps and plugs.</p>
<p>The fittings&#8217; four precision components &#8211; a male nut, female body, front ferrule, and back ferrule &#8211; combine to apply a patented hingeing-colleting action to grip and seal the tubing securely with no special tube preparation required.</p>
<p>The fittings offer low weight and a compact profile to help save space in installations.</p>
<p>Medium-pressure 316/316L stainless steel tubing for use in applications up to 1034bar is available in heavy wall annealed or cold-drawn 1/8-hard condition.</p>
<p>Available tubing sises are 0.25, 0.375 and 0.5in outside diameter, in 20ft and 2, 4 and 6m lengths.</p>
<p>&#8220;Our customers in the alternative fuels and oil and gas markets told us they needed easily reassembled fittings and stainless steel tubing that work consistently at pressures of up to 15,000psig&#8221;, said Peter Ehlers, alternative fuels market manager, Swagelok Company.</p>
<p>&#8220;We&#8217;re very excited to offer the marketplace high-quality medium-pressure products that meet these performance goals&#8221;.</p>
]]></content:encoded>
			<wfw:commentRss>http://surplustubefittings.com/?feed=rss2&amp;p=121</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Swagelok Ball Valves Handle High &amp; Low Pressure</title>
		<link>http://surplustubefittings.com/?p=116</link>
		<comments>http://surplustubefittings.com/?p=116#comments</comments>
		<pubDate>Wed, 20 Oct 2010 22:40:16 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Swagelok Valves]]></category>
		<category><![CDATA[ball valves]]></category>
		<category><![CDATA[high pressure]]></category>
		<category><![CDATA[low pressure]]></category>
		<category><![CDATA[main]]></category>
		<category><![CDATA[stainless steel]]></category>
		<category><![CDATA[swagelok]]></category>
		<category><![CDATA[Valves]]></category>

		<guid isPermaLink="false">http://swageloktubefittings.com/?p=116</guid>
		<description><![CDATA[The Swagelok SK&#8217;s spring-loaded seats and floating ball provide leak-tight integrity in both low and high-pressure systems while reducing wear and extending cycle life. New Swagelok SK series multipurpose ball valves mark the continuing expansion of the company&#8217;s line of &#8230; <a href="http://surplustubefittings.com/?p=116">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p>The Swagelok SK&#8217;s spring-loaded seats and floating ball provide leak-tight integrity in both low and high-pressure systems while reducing wear and extending cycle life.</p>
<p>New Swagelok SK series multipurpose ball valves mark the continuing expansion of the company&#8217;s line of ball valves.</p>
<p>The valves offer positive, quarter-turn shutoff for general process and control applications in fluid systems.</p>
<p>Key features of the new valves have a 316 stainless steel construction, spring-loaded seats, floating ball, low-torque operation, and a compact design.</p>
<p>The spring-loaded seats and floating ball provide leak-tight integrity in both low and high-pressure systems while reducing wear and extending cycle life.</p>
<p>Low torque allows for easy manual operation and the use of smaller pneumatic and electric actuators.</p>
<p>A compact envelope and standard panel mounting make the valves ideal for installation in panels.</p>
<p>In addition to manual actuation, SK series valves are available with standard Swagelok or ISO5211-compliant rack and pinion pneumatic actuators.</p>
<p>End connection choices include Swagelok gaugeable tube fitting, NPT and ISO pipe, and VCO O-ring face seal.</p>
<p>Service options include low-temperature and sour gas applications.</p>
<p>The new valves are rated for working pressures to 413bar and temperatures ranging from -40 to +150C.</p>
]]></content:encoded>
			<wfw:commentRss>http://surplustubefittings.com/?feed=rss2&amp;p=116</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
		<item>
		<title>Swagelok: Consitency, Stability, Exellence</title>
		<link>http://surplustubefittings.com/?p=112</link>
		<comments>http://surplustubefittings.com/?p=112#comments</comments>
		<pubDate>Wed, 20 Oct 2010 22:28:21 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Swagelok Valves]]></category>
		<category><![CDATA[fittings]]></category>
		<category><![CDATA[main]]></category>
		<category><![CDATA[parts]]></category>
		<category><![CDATA[swagelok]]></category>
		<category><![CDATA[Tube Fittings]]></category>

		<guid isPermaLink="false">http://swageloktubefittings.com/?p=112</guid>
		<description><![CDATA[Swagelok has been in business for over 60 years, manufacturing the highest quality valves and tube fittings. We are also a privately held company with sales distributors and warehouses throughout the world that supply excellent support and service. Swagelok has &#8230; <a href="http://surplustubefittings.com/?p=112">Continue reading <span class="meta-nav">&#8594;</span></a>]]></description>
			<content:encoded><![CDATA[<p>Swagelok has been in business for over 60 years, manufacturing the  highest quality valves and tube fittings. We are also a privately held  company with sales distributors and warehouses throughout the world that  supply excellent support and service. Swagelok has been a successful  company as viewed by its end-customers, having the highest quality  products on the market.</p>
<p>Our manufacturing model is machining, processing and assembly, with  over 1000 different work centers. Over the years we have been able to  utilize redundancy of equipment to mask our downtime issues. Unlike a  process plant, we have many options with this redundancy to make or  assemble a specific product. As we started to implement Lean  Manufacturing throughout our supply chain we made good progress in  reducing our costs and the number of touch points. However, when we  started to measure overall equipment effectiveness (OEE) on our machines  we realized we had some major issues with machine downtime. A decision  was made as part of our overall Lean initiative to create and implement a  new maintenance program that would address our machine deficiencies. We  researched different types of approaches to improve our maintenance  programs. After some benchmarking and interviewing different  consultants, we felt that the Reliability Excellence approach offered by  Life Cycle Engineering (LCE) met our requirements. We felt that their  methods and best practices would fit in best with our culture and our  Lean journey. LCE came to Swagelok in 2007 and did an assessment of  where we were in regards to maintenance &#8211; basically how reactive were  we? The results of the audit were that we were on the high end of a  reactive or emerging maintenance program scoring 353 out of a possible  1000.</p>
<p><strong>Progress</strong></p>
<p>The next order of business was the design of the maintenance business  processes &#8211; Materials Management, Work Management and Reliability  Engineering. A fourth team would be focused on integrating these  business processes into our current programs and culture (Integration  Team). Teams for each process were put together by pulling associates  out of their operations group and assigning them to the appropriate team  based on their experience. With the help of LCE, new business processes  were designed to fit the Swagelok model, taking our culture and values  into account along with the shortcomings of our CMMS software (which  were many).</p>
<p><strong>Implementation</strong></p>
<p>An Implementation Team was formed with some members from the business  process design teams inserted onto the Project Implementation team to  ensure continuity. This was to make certain we had good understanding of  the business processes both present state (pre-Reliability Excellence)  and future state. The plan was to go through the company with an  implementation at each site. The deliverables of the project being that  all associates at the site had to be trained in the new business  processes and were using them in their daily line of business. Progress  was measured by auditing a large sample of the groups. The  implementation of all the new business processes was quite a step for  us. Prior to this time we had very informal processes for management of  maintenance and materials. We previously had certain techs always  working on the same equipment so we became good at reacting to  emergencies. In regards to materials management, each site had someone  who knew where most things were and we managed inventory by never  running out of anything.</p>
<p>We then started implementation of the new business processes and paid  special attention to the integration team. This group helped support  the change management and communication of what was happening, going  from a highly reactive approach to a goal proactive approach &#8211; one of  all maintenance work being planned. The idea of no work being performed  without a work order being created, was something we had tried before  but it had never stuck. This time, we knew we had to make sure all the  business processes were followed with no exceptions.</p>
<p>The organizational structure we had at that time was a program that  was “owned” by a corporate continuous improvement group. The maintenance  functions, including Planners and Reliability Engineers (REs) reported  to production at each site that they worked in. After a couple of  months, we realized that we needed a centralized maintenance  organization to get the alignment and collaboration necessary to be  successful. We created a maintenance group that was centrally managed  but within our operations and reporting to a director level. This would  enable us to make better use of resources and take better control of our  MRO spend. Additionally, the implementation project manager would  report to this same director, thus ensuring better communication and  prioritization between the project implementation team and the line of  business groups who were receiving the new business processes.</p>
<p><strong>Results</strong></p>
<p>During our first implementation, we had our first metrics and quickly  realized the amount of downtime we had on our machines. It quickly  became apparent that if we did not get to the root cause of the worst  machines &#8211; or as we called them “bad actors” &#8211; we could not free up any  maintenance resources to work on planned jobs.</p>
<p>In the first six months of 2008, seven machines were consuming 4-5  maintenance technicians’ time working strictly on urgent work orders  with an average monthly unplanned downtime of 17%. The MRO spend on  these machines was also very high. Approximately 10% of our overall  spend for the company was going to this small group of machines. This is  when we realized that in order to meet our operational goals of moving  from reactive to planned work and most importantly, to get the unplanned  downtime down to 2% or less, we needed to address these machines’  issues. To achieve this improvement we assigned one Reliability Engineer  to focus on these critical machines. At other sites, we had similar  issues where the most complex machines had the highest downtime and MRO  spend. We continued with the other two business processes of Materials  and Work Management as we realized that overall long term success  required planning and managing our spare parts. But if we did not  quickly get our arms around the unplanned downtime on our key equipment  we would never get to the goal of 80% planned work.</p>
<p>The approach we took was to take the downtime information we had from  our OEE measurements together with our repair information from our CMMS  software. We then analyzed the data and initially saw that spindle  failure was a major downtime and cost driver of some of the equipment.  The REs used a disciplined problem solving approach that is commonly  used at Swagelok for getting to the root cause of a problem. The result  of this approach was a structured and scalable one. The same approach  worked in the other sites and overall we had good solid plans for all of  our “bad actors”.</p>
<p><strong>Action</strong></p>
<p>As we looked across the organization at these “bad actors” we saw  similar issues at each site including problems such a filtration of our  coolants, issues with lubrication systems not working, a lack of  standard work for rebuilding sub-assemblies such as spindles, and  finally no real way of either predicting or measuring when machine  components needed to be replaced before catastrophic failure. Overall,  we did not really have a strong understanding of the way our equipment  was designed to run. With the reliability approach, we have seen large  reductions in MRO spend &#8211; 25% overall! Additionally, we’ve seen large  reductions in unplanned downtime &#8211; in some areas by as much as 60%. As  we continued upgrades to the equipment, we also improved the maintenance  plans and our predictive approaches were standardized. The large  reduction in MRO spend has more than covered the cost of the project &#8211;  the business case &#8211; quickly gaining the support of senior management.</p>
<p>So why is the Reliability Engineering function so critical, and is it  more critical than the other two business processes: Materials  Management and Work Management? As I see it, if the Work Management and  the Materials Management are executed at a high level this will make you  more efficient, but not reduce failures.</p>
<p>For example, one of our machine platforms had a major problem with  spindle life. We have over 200 spindles total on this equipment thus  leaving us with a significant problem. If we had approached the problem  without getting to the root cause &#8211; a Reliability Engineering approach &#8211;  and instead just focused on managing the supply of spindles and  effective planning of the repairs, we would have had a slight reduction  in the downtime and not affected the spend on rebuilding the spindles  ($300K per year). Using the reliability approach we got to root causes  which were:</p>
<p>• The coolant in the machine was not filtered, so chips were prematurely wearing and/or destroying the seals on the spindles<br />
• The spindle rebuild process was just replacing seals and bearings, not inspecting shafts and housings for wear<br />
• We were using the incorrect type of seal for the job<br />
• A key O-ring was not being replaced</p>
<p>With this knowledge the REs put together a solution which was to:</p>
<p>• Repair and re-engineer the maintenance of the filtration system<br />
• Rebuild the spindle to OEM specifications<br />
• Replace the seal with a more appropriate application (required the spindle housing to be machined)</p>
<p>Once we did all of this, we used vibration analysis to determine  which spindles needed replaced first and we then put together a plan to  repair all of the spindles. So far, we have not had a newly rebuilt  spindle fail in nearly a year. Mean Time Between Failure had been  approximately every 3 months. Using good materials management best  practices we also now control the spare spindles more efficiently and  plan the work better. But again, the spend reduction would have been  insignificant without the RE efforts. Our current predictions to date  indicate that in the next three years, we will spend less than last  year’s cost of $300K on these spindles.</p>
<p>Another example of where the RE process has paid off, is when we  found that another group of machines were indicating 15% unplanned  downtime. The operations group had lost all confidence in these machines  and strongly suggested we replace this machine platform. Using the same  RE approach we found the major issues were:</p>
<p>• Hydraulic problems aeration, overheating and hydraulic oil contamination<br />
• Spindle turret failures<br />
• Issues with the machining process &#8211; the process was engineered in a way that it exceeded the machine specifications</p>
<p>The solution was to:</p>
<p>• Implement a good PM program for the machine<br />
• Put good standard work in place for turret rebuilds<br />
• RCA for some failures was a weak key-way design<br />
• Had the process engineers change the process to eliminate damage to the machine</p>
<p>This corrected the major issues and we are now achieving just 4% of  unplanned maintenance downtime! Using the other good work management and  materials management processes, we have established lower stocking  levels for spare parts and we have stronger, well-written job plans for  turret rebuilds which will enable us to sustain the gains. Without the  Reliability Engineering tools we would not have reduced the downtime and  spend so significantly.</p>
<p>Article submitted by:</p>
<p>Peter Sheard, Director of Manufacturing Support<br />
Richard M. Jamison, Client Success Champion</p>
]]></content:encoded>
			<wfw:commentRss>http://surplustubefittings.com/?feed=rss2&amp;p=112</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
	</channel>
</rss>

